FANUC Alarm PNT2-515 — Color Valve + PrgSol both ON
Manufacturer wording — %sColor Valve + PrgSol both ON
The manual prints placeholders; your controller fills them in with the real group, axis or number.
FANUC PNT2-515 (“Color Valve + PrgSol both ON”): For integral color change systems only: During the execution of a color change cycle, the color enable output and the Purge Solvent output are not allowed to be ON at the same time. First check: Check the cycle data table and make sure the color enable and Purge Solvent outputs are never ON at the same time.
Updated 2026-09-17 · LogrobotLM reference
Description
For integral color change systems only: During the execution of a color change cycle, the color enable output and the Purge Solvent output are not allowed to be ON at the same time. If the color change cycles attempt to do this, the cycle is aborted. (This is to prevent contamination of the paint lines.)
Remedy
Check the cycle data table and make sure the color enable and Purge Solvent outputs are never ON at the same time.
Related codes
Indicative field information — the robot manufacturer's manual and safety procedures always prevail. Never bypass a safety device; apply lockout/tagout (LOTO) before any physical intervention. How this reference is built →